Wonder Bread (Continental Baking Co.) Salt Lake City, UT
- 1974-Design-build new 4000 amp 12,470 X 240 volt sub station on the roof for distribution equipment to allow for a major expansion of the production facility (previous service was 2200 X 240 volt three-phase vault).
- 1985-Increase substation size from 4000 amp to 8000 amp 12,470 X 240 volt at the same location. Increase the distribution system to allow for a new production facilities support area. Design system and production controls including programming.
- 1992-Design-build electrical for a new muffin production area. Design includes all production controls, installation and programming of equipment.
- Power factor correction system design and installation. Coordinated efforts with Utah Power and Light Co. to install a power factor monitoring correction system to help eliminate recurring monthly charges.
Snelgroves Ice Cream (Dreyers) Salt Lake City, UT
- 1994-Design-build new 4000 amp service and distribution system for a major plant expansion. Design and install new freezer building including negative 50 Degrees Quick-freeze area. Upgrade lighting on production floor.
- 1996-Design-build freezer building expansion and production floor remodel.
- 2000-Design-build new tank farm and mixing facility including power distribution, production control and instrumentation.
- 2004-Design-build new offices, sales area and conference / training room. Move phone and computer equipment rooms. Build new quality control testing lab.
- 2006-Design-build new Machine Room/Plant Control area. Temporarily relocate eight air compressors during construction of new building. Install eight air compressors in new building. Upgrade lights in plant to more energy efficient “Green” lighting. Major redesign and rework of service and distribution throughout plant.
- 2007-Design-build new production floor area for product expansion. Design-build new packaging and palletizing area.
- 2009- Installation of energy efficient equipment such as VFD’s, “Green” lighting and HVAC controls.
Intermountain Wood Products
- Design and build a new sales office building and counter area.
- Redesign lighting in corporate offices and production floor areas and install.
- Design and install new backup power system and generator for main facility.
- Design and install electrical for wood drying building and air exchange system
- Redesign and rework power distribution system and lighting in lumber warehouse and shipping areas.
LANDesk Software and Data Services
Design and install secure data storage facility power system including:
- 100 KVA of UPS units and distribution
- 500 KVA Generator and Transfer Switch
- All Vertical distribution to equipment closets
- Installation of Video Monitoring and Networking equipment
Hammerton Lighting Manufacturing
- 2007- Correction of power system problems and installation of production area equipment.
- 2008-Design-build a new 120,000 Sq Ft production facility and offices. Relocate production facility on critical shutdown schedule to allow continuous flow of product.
- Design-build control system for air handling system in spray booth and production floor area.
|
|