Commercial Electrical Services in Salt Lake City, UT

Ongoing projects spanning many years:
St. Mark's Hospital
 
  • Upgraded parking area lighting
  • Installed MRI room and CAT Scan
  • Rebuilt and upgraded high voltage switch gear
  • Upgraded and repaired service
  • Remodeled surgery area with standby generator and emergency power transfer switch upgrade
 
  • Repaired and replaced Busduct
  • Relocated and remodeled the emergency room and X-ray department and replaced X-ray machines
  • Improved energy conservation on lighting and power control
 
 
 
Hammerton
  • Furnished and installed a new 500 KW critical power backup generator, transfer switch, and switch gear necessary to interface with an existing critical data storage facility while maintaining all critical power to the facility
  • Ran new distribution lines and installed panels and receptacles as required
 
The Boyer Company
  • Power-metering equipment on tenant spaces on multi-story business high-rise
 
Chipotle Mexican Grill
  • Power and data lines in Utah and Wyoming locations
 
Wal-Mart
  • Power, equipment, and lighting in Utah and Wyoming stores
 
Moulding FX
  • Power distribution and machine connection